TASK: Establish source-level fast-check lane #60

Open
opened 2026-06-17 19:30:08 -04:00 by darkhelm · 0 comments
Owner

Summary

Create or formalize a fast source-level lane for lint, formatting, type checks, and unit tests as an early gate.

Problem

Fast feedback should occur before heavier post-build runtime validation, reducing wasted build/test cycles.

Scope

  1. Group source checks into a fast lane.
  2. Define gate behavior for downstream post-build validation and promotion.
  3. Ensure reports are visible and actionable.

Out of Scope

  1. Black-box integration validation.
  2. Staging deployment.

Acceptance Criteria

  1. Source-level lane runs independently and consistently.
  2. Failure in source lane blocks downstream promotion path.
  3. Outputs are clear in CI logs and statuses.

Dependencies

Parent epic.

Definition of Done

A deterministic source-level gate exists and is enforced before promotion.

## Summary Create or formalize a fast source-level lane for lint, formatting, type checks, and unit tests as an early gate. ## Problem Fast feedback should occur before heavier post-build runtime validation, reducing wasted build/test cycles. ## Scope 1. Group source checks into a fast lane. 2. Define gate behavior for downstream post-build validation and promotion. 3. Ensure reports are visible and actionable. ## Out of Scope 1. Black-box integration validation. 2. Staging deployment. ## Acceptance Criteria 1. Source-level lane runs independently and consistently. 2. Failure in source lane blocks downstream promotion path. 3. Outputs are clear in CI logs and statuses. ## Dependencies Parent epic. ## Definition of Done A deterministic source-level gate exists and is enforced before promotion.
darkhelm changed title from Establish source-level fast-check lane to TASK: Establish source-level fast-check lane 2026-06-18 11:56:04 -04:00
darkhelm added the ops label 2026-06-18 11:57:28 -04:00
darkhelm added this to the E10 - Separate deployable runtime images from CI milestone 2026-06-18 11:58:18 -04:00
darkhelm added this to the Main Project Board project 2026-06-18 11:59:12 -04:00
copilotcoder was assigned by darkhelm 2026-06-18 11:59:44 -04:00
darkhelm added the afkdevextask labels 2026-06-18 12:03:51 -04:00
darkhelm moved this to To Do in Main Project Board on 2026-06-19 09:23:52 -04:00
Sign in to join this conversation.